WWTP Improvement Project

Project Type:
Sewer
Project Status: 
Underway
Location: 
Wastewater Treatment Plant (WWTP) Facility
1357 Pleasant Valley Rd
Sweet Home, OR 97386

PAGE UNDER CONSTRUCTION

 

The City of Sweet Home Wastewater Treatment Plant Improvement Project is currently in design to upgrade old and undersized equipment to comply with State regulations.

The City has contracted with West Yost Associates for final design engineering.  The project has been split into multiple construction phases:

Phase 1 consists of a new influent pump station, Main Electrical and Blower Building, site demolition, site grading, retaining walls and yard piping

Phase 1: Influent pump station, Main Electrical and Blower Building, site demolition, site grading, retaining walls and yard piping. New electrical service and switchgear, standby generator and automatic transfer switch and other associated electrical upgrades.

Phase 2: all other WWTP upgrades

Phase 3: new WWTP outfall (if required)

 

Sweet Home has been awarded two grants totaling $9 million from the State of Oregon and a $30 million EPA loan with potential for partial loan forgiveness to assist with project funding.

Construction is expected to begin in fall 2022 and end in spring 2025.

WWTP